Management of Reengineering of Business Processes of the Transport System Enterprises at Freight Transportation

Authors

DOI:

https://doi.org/10.35588/rivar.v10i30.5825

Keywords:

management, business process reengineering, enterprises, transport system, freight transportation

Abstract

The study provides a comprehensive approach to reengineering business processes in transport system enterprises, which can help improve the efficiency and effectiveness of cargo transportation services. The purpose of this article is to consider the structural elements of management that provide reengineering of business processes of transport system enterprises in freight transportation. A comprehensive approach to the assessment of structural elements of management was developed. They form the functional flows of business process reengineering by transport system enterprises using simulation modeling and determine scenarios of quality freight, according to indicators that characterize the parameters of their effectiveness. The mathematical basis for the construction of a simulation model of scenarios for the reengineering of business processes of enterprises based on structural elements of management is substantiated. The model of the formation of the system of functional flows of management in the reengineering of business processes of enterprises is presented. The method of calculating indicators of the dynamic state of functional flows during the reengineering of business processes as structural elements of enterprise management are determined. The volume of rendering of cargo transportation services by the enterprises of the transport system of Ukraine is analyzed.

Downloads

Download data is not yet available.

References

Arora, S. and Kumar, S. (2000). “Reengineering: A Focus on Enterprise Integration”. Inter-faces 30(5): 23-54.

Baishemirov, Z.; Tang, J.G.; Imomnazarov, K. and Mamatqulov, M. (2016). “Solving the problem of two viscous incompressible fluid media in the case of constant phase saturations”. Open Engineering 6(1): 742-745. DOI https://doi.org/10.1515/eng-2016-0100

Bekbauov, B.; Berdyshev, A.; Baishemirov, Z. and Bau, D. (2017). “Numerical Validation of Chemical Compositional Model for Wettability Alteration Processes”. Open Engineering 7(1): 416-427. DOI https://doi.org/10.1515/eng-2017-0049

Corbitt, G.; Wright, L. and Christopolus, M. (2000). “New Approaches to Business Process Redesign: A Case Study of Collaborative Group Technology and Service Mapping”. Group Decision and Negotiation 9(2): 97-107. DOI https://doi.org/10.1023/A:1008750520257.

Dobson, Ph.J. (2003). “Business Process Reengineering (BPR) Versus Outsourcing-Critical Perspectives”. Systemic Practice and Action Research 16(3): 225-233. DOI https://doi.org/10.1023/A:1023863906650.

Dooley, K. and Johnson, D. (2001). “Changing the New Product Development Process: Reengineering or Continuous Quality Improvement?”. Measuring Business Excellence 5(4): 20-32. DOI https://doi.org/10.1108/eum0000000006517

Eto, H. (2001). “Service Quality Assessment and Service Process Reengineering”. International Journal of Services Technology & Management 2(3-4): 311-326. DOI https://doi.org/10.1504/ijstm.2001.001607

Harris, J.M. (1997). “The Real Value of Reengineering: Making Management”. Directorship 23(6): 4-5.

Hitt, M.A.; Gimeno, J. and Hoskisson, R.E. (1998). “Current and Future Research Methods in Strategic Management”. Organizational Research Methods 1(1): 6-44. DOI https://doi.org/10.1177/109442819800100103

Hoskisson, R.E.; Hitt, M.A.; Wan, W.P. and Yiu, D. (1999). “Theory and Research in Strategic Management: Swings of a Pendulum”. Journal of Management 25(3): 417-456. DOI https://doi.org/10.1016/S0149-2063(99)00008-2

Irani, Z.; Hlupic, V. and Giaglis, G. (2000). “Business-Process Reengineering: A Design Perspective”. International Journal of Flexible Manufacturing Systems 12(4): 247-252. DOI https://doi.org/10.1023/a:1008103931482

Ivanova, I.V. (2010). “Reengineering as a Method of Ensuring the Competitiveness of Entrepreneurial Structures in Crisis Periods”. Bulletin of the Saratov State Technical University 3(1): 252-258.

Ivashchenko, A.V.; Stalkin, Ð.Ð. and Kalyshenko, U.M. (2004). “Application of UML methodology in business process automation”. http://zhurnal.ape.relarn.ru/articles/2004/094.pdf (accessed 20/06/2022).

Ketners, K. (2020). “Spending review as essential part of public sector budgeting: latvian experience”. Proceedings of the 2020 International Conference "Economic Science for Rural Development" 53: 97-106.

Kharlamov, M.Y.; Krivtsun, I.V. and Korzhyk, V.N. (2014). “Dynamic model of the wire dispersion process in plasma-arc spraying”. Journal of Thermal Spray Technology 23(3): 420-430. DOI https://doi.org/10.1007/s11666-013-0027-4

Kliem, R.L. (2000). “Risk Management for Business Process Reengineering Projects”. Information Systems Management 17(4): 50-71. DOI https://doi.org/10.1201/1078/43193.17.4.20000901/31256.12

Kobelev, N.B. (2003). Fundamentals of Modeling of Complex Economic Systems. Moscow, Delo.

Kopp, S. (2001). “Reengineering your Purchasing Card Program”. Financial Executive 17(1): 39-50.

Koubarakis, M. and Plexousakis, D. (1999). “Business Process Modeling and Design a Formal Model and Methodology”. BT Technology Journal 17(4): 23-35. DOI https://doi.org/10.1023/a:1009686723414

Krawczyk, A. (2022). “Proposal of Redefinition of the Terms Geomatics and Geoinformatics on the Basis of Terminological Postulates”. ISPRS International Journal of Geo-Information 11(11): 557. DOI https://doi.org/10.3390/ijgi11110557

Kulikov, G.G. and Konev, K.Ð. (2006). “Methodology of Machine-Building Enterprise Management on the Basis of Integration of its Business Processes”. Bulletin of the UGATU 2(15): 82-91.

Lee, Ch.Y.; Rittisakdanon, N. and Zhou, X. (2001). “Reengineering for Time-Based Competition: Reducing Time-to-Market by Reengineering”. International Journal of Management 18(1): 20-33.

Linton, J.D. and Walsh, S.T. (2008). “Acceleration and Extension of Opportunity Recognition for Nanotechnologies and Other Emerging Technologies”. International Small Business Journal 26(1): 83-99. DOI https://doi.org/10.1177/0266242607084660

Makin, P.; Cooper, G. and Cox, C. (1997). “A Practical Guide to Business Process Reengineering”. Long Range Planning 30(1): 128-140.

McClennen, J.C. and Ingersoll, D.M. (1997). “Cultural Change through Quality Process Management”. College Student Journal 31(1): 51-68.

Nastisin, L.; Gavurova, B.; BaÄík, R.; Kopor, I. and Kral, S. (2022). “Analysis of perceived customer satisfaction in the context of rail transport: a case stude of the Slovak market”. Entrepreneurship and Sustainability Issues 9(4): 427-438. DOI http://doi.org/10.9770/jesi2022.9.4(23)

Naumov, Ð.Ð. and Khairulin, M.B. (2009). “Management of Business Processes in Conditions of Uncertainty”. Bulletin of UGTU-UPI 2: 109-119.

Paik, S.K. and Bagchi, P.K. (2000). “Process Reengineering in Port Operations: A Case Study”. International Journal of Logistics Management 11(2): 39-59. DOI https://doi.org/10.1108/09574090010806164

PeriokaitÄ—, P. and DobrovolskienÄ—, N. (2021). “The impact of COVID-19 on the financial performance: a case study of the Lithuanian transport sector”. Insights into Regional Development 3(4): 34-50. DOI http://doi.org/10.9770/IRD.2021.3.4(3)

Remenyi, D. and Heafield, A. (1996). “Business Process Reengineering: Some Aspects of How to Evaluate and Manage the Risk Exposure”. International Journal of Project Management 14(6): 349-357. DOI https://doi.org/10.1016/0263-7863(96)00013-0

Runova, E.V. (2008). “Modeling of Business Processes in Terms of Financial Recovery of an Industrial Enterprise”. Vestnik KGFEI 4: 23-25.

Sandberg, K.D. (2001). “Reengineering Tries a Comeback – this Time for Growth, not Just for Cost Savings”. Harvard Management Update 6(11): 3-6.

Sergeeva, A.D. (2008). “System of Motivation of Top Managers on the Basis of Business Value Indicator”. Bulletin of UGTU-UPI 3: 25-32.

Siew, K.S. and Boon, S.N. (1996). “The Impacts of Business Process Reengineering on Organizational Controls”. International Journal of Project Management 14(6): 341-348. DOI https://doi.org/10.1016/0263-7863(96)00015-4

Skorokhod, A.Z.; Sviridova, I.S. and Korzhik, V.N. (1994). “The effect of mechanical pretreatment of polyethylene terephthalate powder on the structural and mechanical-properties of coatings made from it”. Mechanics of Composite Materials 30(4): 328-334.

Sohmen, V.S. (1998). “Principles of Business Process Reengineering, Tqm and the Learning Organization”. Transactions of AACE International 3: 10-13.

Stepanchuk, O.; Bieliatynskyi, A.; Pylypenko, O. and Stepanchuk, S. (2017). “Surveying of traffic congestions on arterial roads of Kyiv city”. Transbaltica 2017: Transportation Science and Technology 187: 14-21.

Stepanchuk, O.; Bieliatynskyi, A.; Pylypenko, O. and Stepanchuk, S. (2016). “Peculiarities of city street-road network modelling”. Proceedings of the 9th International Scientific Conference (Transbaltica 2015) 134: 276-283.

Downloads

Published

2023-08-25

Issue

Section

Articles